Cairo, EgyptWATER & WASTEWATER MANAGEMENTInfrastructure
Industrial Zone Sewerage System in Arab El A'wamer
Overview
Excavation, backfilling and reinforced concrete manhole construction for the industrial zone sewerage system at Arab El A'wamer, Cairo.
Extensive excavation and backfilling operations; supply and backfilling of clean replacement soil; concrete works; and construction of reinforced concrete manholes of various types, depths and diameters.
Reference No. 2013/2012-30. Awarded October 2012 with a 20-month implementation period and completed in June 2014.
Managing the project efficiently amid an unstable economic climate, against a tight 20-month implementation schedule.
Equipment and manual labour were used for the excavation and backfilling works, with mechanical excavation for the deeper sections.
Project Highlights
- ▸Excavation works: 28,223 linear metres
- ▸Backfilling: 16,320 m³
- ▸Concrete works: 1,000 m²