Bulk earthmoving for the New Assiut Barrage on the Nile — 6.5 million m³ of material loaded, moved and offloaded.
Loading, moving and offloading dirt.
The full contract value of USD 1,212,000 covered loading, moving and offloading of dirt.
The size and scale of the project were the principal challenges.
Project Highlights
- ▸6,500,000 m³ of material loaded, moved and offloaded