DIALYSIS CENTER
by editor | May 6, 2026 | 0 comments
Dialysis Center
Hargeisa — SomalilandContract Identification
Dialysis Center in Hargeisa
Award Date, Implementation Period
2018
Actual Completion Date
July 2019
Role in Contract
Main Contractor
Management Contractor
Total Contract Amount
421,836 USD
If Partner in a JV, or Subcontractor, Specify Participation in Total Contract Amount
N/A
N/A
N/A
Employer's Name
Engineering Office of HH Sheikh Mansour Bin Zayed
Description of the Similarity
Built Environment:- Two connected buildings, including diagnostic rooms and 30 patient bedrooms with related facilities.
- Includes offices, a lab, and a small blood bank.
- Building outer fence 2m high.
- Pavement of curbstone for sidewalks and supply of grass.
- Implementation of tiled external stair.
- Installing LV systems including distribution boards, sockets, and switches.
- Providing lighting devices and cables.
- Installing phone and information network system.
- Supply and install CCTV.
- Supply and install fire alarm system.
- Supply and install standby power generation system.
- Implementing plumbing works for pipes and accessories.
- Installing sanitary and toilet accessories.
- Providing rainwater system.
- Supply 2000 L fiberglass water tank.
- Supplying and implementing electric heaters and AC units.
- Supplying fire extinguishing system.
Amount
Buildings:
- The total cost of sub-structure, super structure construction, and finishing is USD 261,495.
External Works and Landscape:
- The construction cost of paved areas, green spaces, and hardscape works is USD 7,100.
MEP:
- The total cost of firefighting, plumbing, and HVAC works is USD 146,105.
Physical Size
Built Environment:- Two connected buildings with 302 m² area.
- Above 10 air conditioning split units with max cooling and heating capacity of 2.5 ton.
- Firefighting systems containing 6 kg dry powder fire extinguishers.
Complexity
- The project site is located in the middle of the city with no storage location for material and equipment.
- Concrete casting had higher specifications and execution complexity due to LV and MV network healthcare requirements.
- The site was close to existing structures that required reinforcement to avoid cracks.
Methods / Technology
- Traditional construction process building methodology.
- Water supply and drainage networks required more detailed specifications due to the sensitivity of medical equipment.
- All medical equipment was imported to Somaliland.