Infra

Projects

DIALYSIS CENTER

by editor | May 6, 2026 | 0 comments
DIALYSIS CENTER

Dialysis Center

Hargeisa - Somaliland
🏥

Contract Identification

Dialysis Center in Hargeisa

📅

Award Date, Implementation Period

2018

Actual Completion Date

July 2019

👷

Role in Contract

Main Contractor

Management Contractor

💰

Total Contract Amount

421,836 USD

👥

If Partner in a JV, or Subcontractor, Specify Participation in Total Contract Amount

N/A

N/A

N/A

🏛️

Employer's Name

Engineering Office of HH Sheikh Mansour Bin Zayed

📋

Description of the Similarity

Built Environment:

  • Two connected buildings, including diagnostic rooms and 30 patient bedrooms with related facilities.
  • Includes offices, a lab, and a small blood bank.
  • Building outer fence 2m high.

External Works and Landscape:

  • Pavement of curbstone for sidewalks and supply of grass.
  • Implementation of tiled external stair.

Electrical Work:

  • Installing LV systems including distribution boards, sockets, and switches.
  • Providing lighting devices and cables.
  • Installing phone and information network system.
  • Supply and install CCTV.
  • Supply and install fire alarm system.
  • Supply and install standby power generation system.

Mechanical and Plumbing System:

  • Implementing plumbing works for pipes and accessories.
  • Installing sanitary and toilet accessories.
  • Providing rainwater system.
  • Supply 2000 L fiberglass water tank.
  • Supplying and implementing electric heaters and AC units.
  • Supplying fire extinguishing system.
🪙

Amount

Buildings:

  • The total cost of sub-structure, super structure construction, and finishing is USD 261,495.

External Works and Landscape:

  • The construction cost of paved areas, green spaces, and hardscape works is USD 7,100.

MEP:

  • The total cost of firefighting, plumbing, and HVAC works is USD 146,105.
📐

Physical Size

Built Environment:

  • Two connected buildings with 302 m² area.

MEP:

  • Above 10 air conditioning split units with max cooling and heating capacity of 2.5 ton.
  • Firefighting systems containing 6 kg dry powder fire extinguishers.
🛡️

Complexity

  • The project site is located in the middle of the city with no storage location for material and equipment.
  • Concrete casting had higher specifications and execution complexity due to LV and MV network healthcare requirements.
  • The site was close to existing structures that required reinforcement to avoid cracks.
⚙️

Methods / Technology

  • Traditional construction process building methodology.
  • Water supply and drainage networks required more detailed specifications due to the sensitivity of medical equipment.
  • All medical equipment was imported to Somaliland.

Submit A Comment

Your Email Address Will Not Be Published. Required Fields Are Marked