INFRASTRUCTURE FOR SHEIKH KHALIFA HOUSING PROJECT, 204 HOUSING UNITS, HADRAMOUT, YEMEN

by editor | May 6, 2026 | 0 comments
INFRASTRUCTURE FOR SHEIKH KHALIFA HOUSING PROJECT, 204 HOUSING UNITS, HADRAMOUT, YEMEN

Infrastructure for
Sheikh Khalifa
Housing Project

204 Housing Units, Hadramout, Yemen
🏗️

Contract Identification

Infrastructure for Sheikh Khalifa Housing Project, 204 housing units, Hadramout, Yemen

📅

Award Date, Implementation Period

July 2016, 20 months

Actual Completion Date

February 2018

👷

Role in Contract

Main Contractor

Sub-Contractor

Management Contractor

💰

Total Contract Amount

USD 3,634,535

Three million, six hundred thirty-four thousand, five hundred and thirty-five dollars

👥

If Partner in a JV, or Subcontractor, Specify Participation in Total Contract Amount

N/A

N/A

N/A

🏛️

Employer's Name

Emirates Red Crescent

Zayed Sports City, Abu Dhabi, UAE

📋

Description of the Similarity

Roads:

  • Design and construction of a road network within the Sheikh Khalifa Housing Project.
  • Works include concrete sidewalks, structural works, and drainage works for rain.

Water:

  • Design, supply, and installation of the main water supply network.
  • Works include associated elements such as valves, chambers, and meters.
  • Design, supply, and installation of the minor water supply network.
  • Works include valves, inspection chambers, and meters.

Wastewater:

  • Design, supply, and installation of the wastewater system.
  • Works include manholes, house connections, and service chambers.

Power:

  • Design, supply, and installation of the solar power supply network.
📐

Physical Size

Roads:

  • An asphalt road network with 7m width and approximately 5 km total length.

Water:

  • Minor network of length 122 m consisting of UPVC pipes with diameters of 25, 50, 63, 90, and 110 mm.
  • HPPE primary major water network of length 97 m with diameters from 160 to 300 mm for the distribution network.
  • Number of valve chambers across the whole network: 5.
  • Number of washing chambers across the whole network: 70.

Wastewater:

  • A 5.656 km wastewater system of concrete pipes with diameters varying between 150 and 200 mm.

Power:

  • The solar power supply network consists of 204 units, 250 watt each.
🪙

Amount

Water and Wastewater:

  • The total cost of the water network works is USD 8,268.

Submit A Comment